Idle game production bottleneck calculator

Compare three stages of a production line. Test where a speed upgrade actually changes the number of finished items per minute.

Try the example or change the entries

Your entries stay in this tab.

Worked example

A printer at 8 items/min, a packer at 5 and a shipper at 7 finish at most 5. Giving the printer 3 extra items/min changes nothing. Giving them to the packer lifts output to 7.

How to use it

The model assumes unlimited demand, full input buffers and a serial line. It is a small sandbox for upgrade reasoning.