Replace a material allowance in a contractor quote

Change a per-unit allowance to the price of the selected fixture or finish. See the revised estimate and the exact credit or addition.

Your numbers

3,910.00 revised quote

Six fixtures at 15 less each give a 90.00 credit.

What happens when the client picks a less expensive fixture?

An original 4,000 quote includes six fixtures at 80 each. The client selects fixtures at 65. The difference is 15 per fixture, so the quote drops by 90 to 3,910. Adding the new fixture total to the original quote would count the allowance twice.

How the calculation works

Start with the full quote including the allowance. Subtract the included cost for all units, then add the selected cost for the same count. Use one currency and the same tax basis throughout. Enter any separately agreed labour, markup or tax adjustments outside this calculation.