A contractor math game
Nine-Bid Workshop
Three work plans. Three prices. Win the job with the lowest bid that meets every condition.
Fit a pair of closet shelves
The customer wants two shelves fitted before the room is occupied.
- Customer limit
- $265
- Time limit
- 4 hours
- Minimum margin
- 25%
How the bidding works
Choose one work plan and one price. A winning bid fits the time limit, stays within the customer’s maximum and meets the minimum margin. If more than one price qualifies, the lower price wins. Undo a decision by changing either choice and submitting again.
Work the first job on paper
For the pre-cut shelves, materials cost $61. Three hours of labour at $35 add $105 and the fixed job cost is $20. Total cost is $186. A $250 bid leaves $64, or 25.6% of the customer price. It fits the four-hour deadline and $265 limit. A $235 bid leaves only 20.9%.
All jobs and amounts are fictional. Margin is (bid minus job cost) divided by the bid. Each job states the costs it uses.